F.2. List of Level Two - Detailed BIM Use Process Map(s): Attachment 3

1. List of Level Two – Detailed BIM Use Process Map(s): Attachment 3

The following are examples. Modify for specific project. Some Process Maps may need to be removed, while some process maps may need to be added.

  1. Existing Conditions Modeling
  2. Cost Estimation
  3. Phase Planning (4D Modeling)
  4. Programming
  5. Site Analysis
  6. Design Reviews
  7. Design Authoring
  8. Energy Analysis
  9. Structural Analysis
  10. Lighting Analysis
  11. 3D Coordination
  12. Site Utilization Planning
  13. 3D Control and Planning
  14. Record Modeling
  15. Maintenance Scheduling
  16. Building System Analysis

[Delete unused or add additional process maps from list]